Underwrite datacenter sites before you wire the deposit
Datacenter Feasibility runs power, site, and regulatory diligence on a prospective datacenter site — greenfield, brownfield, or an existing operating asset — and rolls the findings into an underwriting model and IC memo.
Beta access is invite-first — reach out and we'll get you into a workspace.
Datacenter site diligence means a dozen specialists and a slow deal clock
The Challenge
- Power/interconnection capacity takes weeks of utility back-and-forth.
- Zoning, title, and environmental checks live with outside counsel and consultants.
- Tax incentive and market comp research is scattered across state and county sources.
- Every deal needs a separate underwriting model and IC memo built by hand.
The Datacenter Feasibility Solution
- One deal record per site, with target MW, capex, and deal type up front.
- Power feasibility runs live today — utility ID, interconnection queue, and rate structure, cited.
- Every study resolves to a GO / CONDITIONAL / NO-GO verdict with cost and timeline ranges.
- Underwriting model and IC memo export straight from the deal.
21 study types, four categories
Power feasibility runs live today, grounded in real-time utility and interconnection sources with citations. The rest of the cohort runs on the same underwriting framework and is rolling out during the beta.
Power & Utility
Site & Environmental
Regulatory & Financial
Deliverables
Greenfield, brownfield, or existing asset
Greenfield
Raw land, ground-up build.
Brownfield
Existing structure, repurposed for critical load.
Existing Asset
Operating datacenter, acquisition underwriting.
Bring a site into diligence
Datacenter Feasibility is in beta as part of Luminate. Reach out and we'll get you into a workspace to run power, site, and regulatory feasibility on your next site.